[1]
Quirós-Tortós, J. and Fernández-Porras, P. 2017. Controlled Islanding with Special Consideration of Parallel Power System Restoration Constraints. Ingeniería. 27, 1 (May 2017), 113–131. DOI:https://doi.org/10.15517/jte.v27i1.26443.