Public Works. Contract Delivery Deadline Control
LANAMME, University of Costa Rica
Abstract
The delivery time of a civil construction project is one of the most critical factors requiring thorough planning and control in order to achieve efficiency and effectiveness for the project owner. Every owner seeks to obtain the completed civil works as soon as possible—whether to sell, lease, or use the facility—thus allowing for an earlier return on investment or the fulfillment of commercial objectives. In the case of public works, the end user—the citizen who relies on roads, schools, or public hospitals—expects access to these services as soon as possible in order to meet their needs. In this way, the benefit of the public work is delivered to the region within the required timeframe, avoiding delays that could disrupt the provision of public services. In the field of transportation, roads completed within a reasonable period enable regional connectivity and facilitate the economic development of an area by improving the mobility of people, vehicles, and goods. On the other hand, when road construction projects experience significant delays, regional and national economic development is likewise hindered. (ref. No. 2 and No. 6)
References
- Asamblea Legislativa de Costa Rica. Ley y reglamento de la Contratación Administrativa de la República, año 1996, San José, Costa Rica
- Barrie & Paulson. Professional Construction Management. Edit. McGraw Hill, USA, 1992
- Robin & Fairweather. Construction Claims, prevention and resolution, Editorial McGraw Hill, USA, 2001
- Garza; Juan. Valores para el ejercicio profesional. Editorial Prentice, México, 2004
- Garza, Voster & Parwin. Total float traded as commodity. Jounal of Construction Engineering and Management. American Society of Civil Engineers, Vol. 117, No.4, 1991, USA
- Kraemer, Pardillo, Rocci & otros. Ingeniería de Carreteras, Tomo I, Editorial Mc Graw Hill- España, 2002.
- Householder & Rutland. Who owns the float?. Jounal of Construction Engineering and Mavnagement. American Society of Civil Engineers, Vol. 116, No. 1, 1990, USA.
- Miller, Rielle. Moral Courage. Del Website: www.respondanet.com Congreso UNESCO
- Lanamme, Universidad de Costa Rica. Auditoría técnica externa de obra Mejoramiento de ruta No. 606, Interamericana Guacimal, año 2002, San José, Costa Rica y cartel de contratación.
- Lanamme, Universidad de Costa Rica. Auditoria técnica externa de obra Mantenimiento periódico de la ruta No. 1, Sección Barranca-Peñas Blancas, 2003, San José, Costa Rica y cartel de contratación.
- Project Management Institute. (PMI) Una guía a los fundamentos de la Dirección de proyectos, Pensilvania, USA, 2002.
- Schmidt, Eduardo. Etica y negocios en América Latina. Editorial Universidad del Pacífico, Perú, 2002.
- Serpell & Alarcón. Planificación y control de proyectos, Editorial Universidad Católica de Chile, año 2002.
- Serpell, Alfredo. Administración de Operaciones de Construcción, Editorial Universidad Católica de Chile, 1997.
- Suárez, Carlos. Costo y tiempo en edificación. Editorial Limusa México, 1990.
Downloads
Download data is not yet available.